This service is used for testing installation for possible expansion and to see what additional capacity is present on the system and the unit is usually installed for a 1-2 week interval to ensure a fair assessment of the installation.
The load monitor can also record harmonic distortions and fluctuations in supplies, along with a fair assessment of general use if you believe your electricity meter is reading inaccurately.
Copyright © All Rights Reserved.